Replacement of 20 year old range after fire for new Hewigo high efficiency unit. Coupled with complete refurbishment including back counters, ducting, fridges, tiling and menu boxes.
Chip Shop refurbishment - after
Original Box-Sash commercial-size window refurbished and replaced after shop interior installation.
Glass Fibre Roof- before
Removal of existing leaking roofing material.
Glass Fibre Roof- after
Original Box-Sash commercial-size window refurbished and replaced after shop interior installation.
ASP Sewage Treatment Plant
Installation of Conder ASP Sewage Treatment Plant to replace old septic tank on a site where no mains sewerage was available.
Historical
Cemetary Chapel
Removal of Pews, damp treatment of walls, full patch repairs to ceiling, full decoration and replacement of Pews to bring Chapel back in to use for small ceremonies.
Heritage Centre Lift
Construction of lift-shaft through three floors to tight tolerances (20mm) to enable installation of Stretcher Platform Lift, allowing disability access to all floors. Cosmetic finishing after installation of Lift by local company Calandine Lifts.
Refurbishment
Terrace House- before
Removal of existing leaking roofing material.
Terrace House- after
Modern, fully open plan 3 bedroom property ready for the rental market.
Terrace House- before
Vacated terrace rental property ready to be refurbished to rentable condition.
Terrace House- after
New kitchen, new bathroom, utility and full decoration ready for rental market.
Kitchen & Bathroom refurbishment
New kitchen, new bathroom, utility and full decoration ready for rental market.
Residential
Residential - before
Extensive property extension including Architect drawings and planning consent through our offices; full underfloor heating system on the ground-floor. Upstairs wetroom, creation of a downstairs cloakroom. Kitchen installation to client’s design.
Residential - after
Completed with GRP roof, concealed guttering, sensor controlled electronic roof-lights. Bifold doors opening to decking.